Greenway Renovation

Greenway Renovation Project — Porter Street to Marginal Street
February 2026 — December 2026

Construction Detours Map

Mary Ellen Welch Greenway Construction Closures Map

Summary of Issues Being Addressed

Causes of Stormwater Flooding

  • High water table and low infiltration rates
  • Drainage pipes emptying into the Harbor (fill up at high tide)
  • Low elevation of the Greenway
  • Impervious surfaces and run off at adjacent properties
  • Limited capacity of existing BPRD Pump

Solutions to Stormwater Flooding

  • Reduce storm water & coastal flooding
  • Provide cool spots along greenway to mitigate Urban Heat Island
  • Promote tree health
  • Decreased impervious surfaces
  • Elevate portions of the pathway / bridging over wet areas
  • Coordinate with abutters on containing runoff on site